
The process
What happens from the first call until the system runs. We do the paperwork.
- A first call
A few questions about the roof and the home, and a photo of the electricity bill.
- Roof survey
About an hour at your home: measuring, direction, shade and the roof's condition.
- A written quote
Line by line, with an output estimate and the assumptions written down.
- Requests and approvals
We submit to the Israel Electric Corporation and the local authority as required. The timing depends on them.
- Installation
Usually a day to a few days on the roof, depending on the system size.
- Connection and start-up
After approval: grid connection, start-up, and a walk through the monitoring app.
A roof survey
About an hour at your home: we measure the roof, check shade and look at the electricity bill. The quote follows in writing.
- A survey before every quote
- A quote line by line
- We handle the approvals
Prefer to write? A WhatsApp message, or 053-4417702
You can book by phone at 053-4417702.